Shi, H., & Li, W. (2008). The Integrated Methodology of Rough Set Theory and Artificial Neural-Network for Construction Project Cost Prediction. In 2008 Second International Symposium on Intelligent Information Technology Application Vol. 2 (pp. 60-64). Institute of Electrical and Electronics Engineers (IEEE). doi:10.1109/iita.2008.238
Shi, H., & Li, W. (2008). The Integrated Methodology of Rough Set Theory and Artificial Neural-Network for Construction Project Cost Prediction. In 2008 Second International Symposium on Intelligent Information Technology Application Vol. 2 (pp. 60-64). Institute of Electrical and Electronics Engineers (IEEE). doi:10.1109/iita.2008.238