Skip to main content
placeholder image

The Integrated Methodology of Rough Set Theory and Artificial Neural-Network for Construction Project Cost Prediction

Conference Paper


Abstract


Publication Date


  • 2008

Citation


  • Shi, H., & Li, W. (2008). The Integrated Methodology of Rough Set Theory and Artificial Neural-Network for Construction Project Cost Prediction. In 2008 Second International Symposium on Intelligent Information Technology Application Vol. 2 (pp. 60-64). doi:10.1109/iita.2008.238

Web Of Science Accession Number


Start Page


  • 60

End Page


  • 64

Volume


  • 2

Abstract


Publication Date


  • 2008

Citation


  • Shi, H., & Li, W. (2008). The Integrated Methodology of Rough Set Theory and Artificial Neural-Network for Construction Project Cost Prediction. In 2008 Second International Symposium on Intelligent Information Technology Application Vol. 2 (pp. 60-64). doi:10.1109/iita.2008.238

Web Of Science Accession Number


Start Page


  • 60

End Page


  • 64

Volume


  • 2