placeholder image

On-line monitoring and modelling of elecrtric loads for improving operational conditions of power systems

Grant


Scheme


  • Linkage Projects

Abstract


  • Recently the Tasmanian Electricity System has been connected to the Natiohnal Electricity Market through Basslink. the behaviour of loads to deviations in frequence and voltage becomes critical when transmission constraints begin to control market outcomes. the project will deliver vital information regarding load behaviour and models representing load responses to frequence and voltage excursions with the objective of optimising power exchanges within the National Electricity Market. This will allow Tasmania to take advantage of various renewable technologies.

Date/time Interval


  • 2007

Sponsor Award Id


  • LP0775025

Local Award Id


  • 10373

Scheme


  • Linkage Projects

Abstract


  • Recently the Tasmanian Electricity System has been connected to the Natiohnal Electricity Market through Basslink. the behaviour of loads to deviations in frequence and voltage becomes critical when transmission constraints begin to control market outcomes. the project will deliver vital information regarding load behaviour and models representing load responses to frequence and voltage excursions with the objective of optimising power exchanges within the National Electricity Market. This will allow Tasmania to take advantage of various renewable technologies.

Date/time Interval


  • 2007

Sponsor Award Id


  • LP0775025

Local Award Id


  • 10373